Dry dock Pro
The dry-dock project: specification, yard quotes, budget and progress.
Problems it solves
- Yard quotes compared by hand
- Dry-dock budget overruns
- Specification items forgotten

What you see
What each page shows
- Dry-dock project
- Docks by status, the next docking per vessel from its special survey date, and budget against actual. Each dock opens its specification (PMS jobs and yard items), the yard quotes and award, change orders and progress in the yard.
- Dock history
- Closed docks per vessel with the yard, days in dock, items done and deferred, and budget against actual from the docking report.
Key workflows
Working in Dry dock
- 01
Open the dry-dock project from the survey due date.
- 02
Build the specification from PMS jobs and yard items, then award a yard.
- 03
Start the docking and close it when every item is done.
Steps that send, accept or submit need the publish level for this module.
More screens
Key pages from the demo

Shared records
Records it shares
Written once by one module and linked from the others. Nothing is copied.
Job card
Read hereThe maintenance job with its steps, running hours and spares. Alerts, surveys and the dock specification point to it.
IHM line
Read hereThe hazardous-materials list per vessel; orders and the dock carry the declaration.
Connectors
Integrations
- Yard portalShipyard quotesAvailable on request
- Class survey plannerClass survey datesAvailable on request
Simulated in this build. None is verified with the provider yet; each is set up on request, then connected from the module’s Integrations page.
Packages and packs
Packs that include Dry dock
Dry dock is included on Operations, Professional, Complete.
A pack is Essentials plus a set of Pro modules, priced below Professional.

Tanker compliance
- Voyage performance
- Dry dock
- Emissions ledger
- HSEQ & risk
- Vetting
Professional would be $12,240 per vessel per year. You save $3,945 per vessel a year.
A 10% deposit opens a 1-month trial, then billed annually per vessel. 3-year contract. You can leave in year 1. The deposit is not refunded. No refunds after the trial for the year already started; cancel renewal any time.
Choose the pack
Offshore & gas carriers
- Predictive maintenance
- Dry dock
- Procurement
- Emissions ledger
- HSEQ & risk
- Vetting
Professional would be $12,240 per vessel per year. You save $2,645 per vessel a year.
A 10% deposit opens a 1-month trial, then billed annually per vessel. 3-year contract. You can leave in year 1. The deposit is not refunded. No refunds after the trial for the year already started; cancel renewal any time.
Choose the pack
Ship manager's office
- Dry dock
- Procurement
- Emissions ledger
- HSEQ & risk
- Vetting
- Finance
- Reports & dashboards
Professional would be $12,240 per vessel per year. You save $1,345 per vessel a year.
A 10% deposit opens a 1-month trial, then billed annually per vessel. 3-year contract. You can leave in year 1. The deposit is not refunded. No refunds after the trial for the year already started; cancel renewal any time.
Choose the pack
See Dry dock with the demo fleet
18 vessels of generated data. No sign-in, and nothing is sent.